Power plant flexibilization in Manaus (Brazil)
While MTU Power was retrofitting an LM6000 industrial gas turbine at its facility in Berlin-Brandenburg, the package team had the task of adapting the package to suit the needs of the new turbine. Work included building and attaching the water injection pump, new diffuser, integrating new control and management systems as well as laying new foundations and adapting ducts and cables to new switching boxes for the new signal systems.